Line 116: |
Line 116: |
| | | |
| ==Phase 1: Complete the Transportation to Taiwan (Node Q)== | | ==Phase 1: Complete the Transportation to Taiwan (Node Q)== |
− | In this phase you will be performing a transport operation torwards Node Q. Below are the main approaches going this route: | + | In this phase you will be performing a transport operation torwards Node Q: |
| | | |
| * '''Path:''' {{MapRoute|1||A|pink|B|red|D|Blue|F|Blue|G|Red|M|Red|O|Green|Q|Red}} | | * '''Path:''' {{MapRoute|1||A|pink|B|red|D|Blue|F|Blue|G|Red|M|Red|O|Green|Q|Red}} |
Line 122: |
Line 122: |
| *This phase will require a heavy balance between AACI, ASW, Surface combat, and transportation. | | *This phase will require a heavy balance between AACI, ASW, Surface combat, and transportation. |
| **Weigh carefully how you want to approach this along with how you use your support fleet and LBAS | | **Weigh carefully how you want to approach this along with how you use your support fleet and LBAS |
− | * AACI is required for node A | + | * AACI is recommended for node A |
− | * 1 OASW ship is preffered for nodes B and node G | + | * 1 OASW ship is recommended for nodes B and node G |
− | * To make the trip easier, it's recommended to use a LBAS and an in-route / boss support fleet | + | * It's recommended to use ASW-LBAS for Node {{MapRoute|G|red}} |
− | * One of these should be used to take care of subs on Node G (ASW Carrier in-route Support or ASW LBAS (Range 3))
| + | * Air power at Node Q is 89 - 177 AP | 198 - 396 AS | 396 - 792 AS+ |
− | * One of these should also be used to make the boss node easier (Shelling Boss Support fleet or LBAS at Node Q (Range 2))
| |
− | * Air power at Node Q is 89 - 177 AP / 198 - 396 AS / 396 - 792 AS+ | |
| * While the TP gauge may be slow to drain, this will allow you to clear the TP gauge overtime. | | * While the TP gauge may be slow to drain, this will allow you to clear the TP gauge overtime. |
− | | + | * Boss and Node Support are optional. |
− | Once the TP Gauge is cleared, this phase is complete.
| |
| | | |
| ==1.5: Open the path to Node U== | | ==1.5: Open the path to Node U== |