Changes

Line 79: Line 79:     
===Phase 3===
 
===Phase 3===
 +
* Composition CTF: 2-3 CV(B), 0-1 CV(L), 2-3 CA(V), 0-1 CL + 1 CA, 1 CLT, 1 CL, 3 DD (Blue tag). Maximum of 3 CV(B/L) can be use in the fleet.
 +
* Route: {{MapRoute |B|red|C|blue|F|red|Y1|red|Y2|red|Y|red}}
 +
* LBAS: Range = 7 AP/AS 280/630 ('''HARD''')
    
===Phase 3.5===
 
===Phase 3.5===
2,177

edits