Changes
→Anchorage Repair (泊地修理)
*'''Total repairs (ticks) required = (Hours x 3) + (minutes / 20) + (seconds / 1200) '''
*'''Total repairs (ticks) required = (Hours x 3) + (minutes / 20) + (seconds / 1200) '''
'''<u>Amount of HP repaired per tick</u>
'''<u>Amount of HP repaired per tick</u>'''
'''
*'''HP lost / Total repair required (rounded)'''
*'''HP lost / Total repair required (rounded)'''
*AKA cost per intermediate tick (right on 20minutes).
*AKA cost per intermediate tick (right on 20minutes).
*The minimum repair cost depends on
*The minimum repair cost depends on
**ship class
**Ship class
**HP repaired
**HP repaired
*The minimum repair cost can be generally calculated using
*The minimum repair cost can be generally calculated using
**'''[HP repaired per tick x Class repair cost x Total ticks required(rounded)]'''
**'''HP repaired per tick x Ship Class repair cost'''
*Verification of accurate ship class cost is currently in progress.
*Verification of accurate ship class cost is currently in progress.
<u>'''list of ship class cost'''</u>
<u>'''list of Ship Class Repair cost'''</u>
{| class="mw-collapsible mw-collapsed wikitable"
{| class="mw-collapsible mw-collapsed wikitable"
! colspan="3"| Ship Class Cost (verifying)
! colspan="3"| Ship Class Cost (verifying)
|-
|-
| style="text-align:center;"|AR
| style="text-align:center;"|AR
| style="text-align:center;"|4
| style="text-align:center;"|1.7
| style="text-align:center;"|7
| style="text-align:center;"|3.3
|-
|-
| style="text-align:center;"|Fast BB (Kongou)
| style="text-align:center;"|Fast BB (Kongou)