Open main menu
Home
Random
Nearby
Log in
Settings
About Kancolle Wiki
Disclaimers
Kancolle Wiki
Search
Changes
← Older edit
Newer edit →
Winter 2017 Event
(view source)
Revision as of 19:06, 16 February 2017
26 bytes added
,
7 years ago
m
→E-3
Line 1,210:
Line 1,210:
* Meet '''all''' of the following requirements during the TP phase.
* Meet '''all''' of the following requirements during the TP phase.
** Fleet has a [[Saiun(Disassembled for Transport)]] equipped during the TP phase.
** Fleet has a [[Saiun(Disassembled for Transport)]] equipped during the TP phase.
−
** Pass the LoS check
+
** Pass the LoS check
of F33 = 5.5
** No CV(L/B) or (F)BB(V) allowed
** No CV(L/B) or (F)BB(V) allowed
* Meet '''all''' of the following requirements after destroying the TP gauge.
* Meet '''all''' of the following requirements after destroying the TP gauge.
** Amount of CV(L/B) + (F)BB(V) ≦ 4
** Amount of CV(L/B) + (F)BB(V) ≦ 4
−
** Pass the LoS check
+
** Pass the LoS check
of F33 = 7.5
}}
}}
Tsubakura
cssedit, prechecked
1,656
edits