Open main menu
Home
Random
Nearby
Log in
Settings
About Kancolle Wiki
Disclaimers
Kancolle Wiki
Search
Changes
← Older edit
Newer edit →
Winter 2017 Event
(view source)
Revision as of 03:24, 15 February 2017
131 bytes added
,
7 years ago
m
→E-3
Line 1,205:
Line 1,205:
* Meet one of the following requirements during the TP phase.
* Meet one of the following requirements during the TP phase.
** Fleet does not have a [[Saiun(Disassembled for Transport)]] equipped.
** Fleet does not have a [[Saiun(Disassembled for Transport)]] equipped.
−
** Amount of CV(L/B
) + (F)BB(V
) ≧
5
+
** Amount of CV(L/B) ≧
1
|F -> I =
|F -> I =
−
* Meet '''all''' of the following requirements
:
+
* Meet '''all''' of the following requirements
during the TP phase.
** Fleet has a [[Saiun(Disassembled for Transport)]] equipped during the TP phase.
** Fleet has a [[Saiun(Disassembled for Transport)]] equipped during the TP phase.
+
** Pass the LoS check
+
** No CV(L/B) allowed
+
* Meet '''all''' of the following requirements after destroying the TP gauge.
** Amount of CV(L/B) + (F)BB(V) ≦ 4
** Amount of CV(L/B) + (F)BB(V) ≦ 4
** Pass the LoS check
** Pass the LoS check
Tsubakura
cssedit, prechecked
1,656
edits