Changes

m
Line 1,205: Line 1,205:  
* Meet one of the following requirements during the TP phase.
 
* Meet one of the following requirements during the TP phase.
 
** Fleet does not have a [[Saiun(Disassembled for Transport)]] equipped.
 
** Fleet does not have a [[Saiun(Disassembled for Transport)]] equipped.
** Amount of CV(L/B) + (F)BB(V) ≧ 5
+
** Amount of CV(L/B) ≧ 1
 
|F -> I =  
 
|F -> I =  
* Meet '''all''' of the following requirements:
+
* Meet '''all''' of the following requirements during the TP phase.
 
** Fleet has a [[Saiun(Disassembled for Transport)]] equipped during the TP phase.
 
** Fleet has a [[Saiun(Disassembled for Transport)]] equipped during the TP phase.
 +
** Pass the LoS check
 +
** No CV(L/B) allowed
 +
* Meet '''all''' of the following requirements after destroying the TP gauge.
 
** Amount of CV(L/B) + (F)BB(V) ≦ 4
 
** Amount of CV(L/B) + (F)BB(V) ≦ 4
 
** Pass the LoS check
 
** Pass the LoS check
cssedit, prechecked
1,656

edits